The reclamation system "Tremlya" of the KSUP "Ulyanova" of the Petrikovsky district was created by an open network of canals and closed drainage in 1982. Currently, only half of the drained lands are used for arable land; the rest, due to the process of secondary waterlogging, are heavily waterlogged. To ensure the return of land with an area of 138 hectares to agricultural use, it is necessary to reconstruct the wire network of the reclamation system, flush the existing drainage, restore and build new access structures. As part of the state program "Revival of Pripyat Polesie" funds have been allocated for all these works, and capital investments will amount to 4,8 million rubles per 1 hectare of wetlands. Completing these works will contribute to high yields. In the pictures: 1. Cleaning the open wire network of the reclamation system. 2. Chief engineer of the Petrikovsky enterprise of reclamation systems Vladimir Potorsky (left) and foreman of the drainage brigade Dmitry Yarotsky. 3, 4. Laying drainage. Photo by Sergei Kholodilin, BelTA.